On several occasions, he had guaranteed us "100%" that he was going to pour concrete on set date. For 2 months we heard several excuses of why he did not show up. Stair railing (and eventually stairs) had been ripped from wall leaving large holes and nails hanging out. He claimed the steps were rotted out and needed to be replaced anyway. This is untrue. My house is only 5 years old. Also, my boyfriend spoke to the worker that was framing and laying down some of the gravel asking if he was now working for Matt Rex. His response was, "No. Im just the guy that drinks beer." We were left with the eyesore of a partially framed area, with some of the required rocks and some rebar for almost a month. We had to weed-eat the grass that had grown up through the rocks, it had been so long. After 2 months of excuses, he finally poured the concrete.