Adam Andrews DBA / Platinum Construction Design Build Renovate ; Did agree to complete the compliance of 13 ft base flood elevation -S.B.A. Funded - f.E.M.A. Project at 119 Hampton Circle Hull, Massachusetts 02045 WHICH BEGAN 10-25 COMPLETION DATE 11-25. The total limit of CONSUMER LIABILITY Guaranteed to be $48,000.00 FOR THE 13 FT ELEVATION of the STRUCTURE,
WEATHER TIGHT, AND RENTABLE W / OCCUPANCY PERMIT issued by Joyce Sullivan of Hull Board of Health.
Currently this structure is non - compliant w / the Hull Board of Health, unoccupied, and as a consequence the rent of 1% of the $448,000 value prior to contract or $ 4000.00 per month is currently in the arrears as of this date 2-24.
The total amounts paid for the $48,000.00 contract exceed $83369.50 this does not include the two engineer reports of Neil Murphy and John Spink of $1200.00 and $400.00.
Adam Andrews refuses to correct the issues reported to him by the Town of Hull, Neil Murphy, John Spink, and the property owner.
This failure to act has resulted in this loss of rental income, damage by weather, and reduction of equity by way of maintainence charges.
Complaint / Review
Home Improvement Contracto
Consumer Report
Author: Anonymous 173586
Offender: Home Improvement Contracto
Country: USA State: Massachusetts City: Franklin
Address: 24 Stubb St
Phone: 5089541977
Information
Only registered users can leave comments.
Please Register on our website, it will take a few seconds.
Quick Registration via social networks:


Please Register on our website, it will take a few seconds.
Quick Registration via social networks:
0 comments