I was a contractor for JBC Product Mgmnt. Who is a contractor for GE. I was asked to add equipment on during the summer. Things did not work out for GE or JBC so the cut the rate costing me $3400, with a total loss of $7500 in payments
I was a contractor for JBC Product Mgmnt. Who is a contractor for GE. I was asked to add equipment on during the summer. Things did not work out for GE or JBC so the cut the rate costing me $3400, with a total loss of $7500 in payments
0 comments