Exactly why is there a difference with "COST" costs between conductors from PENN SECTION (AREA 1) TO AREA 7 by having an OP (OFF-PEAK) AREA 7 to AREA 3 solution? I actually donot understand how or what method they are utilizing presently but I actually do remember it on the basis of the face-value about the solution previously prior to the main cost restructuring. Ex. If you did not possess a solution at-all you will be billed a cost near to a-one week METROCARD. STEPUP EXPANDED of 1 BUCK PHONE ASSISTANCS @ 718%
SIMPLY PAY IT "Whats a Buck"
Whether it's Only A BUCK why complain about FUEL.
Arithmetrick
5.75 off-peak 5.75 =11.50
Or TWO OFF-PEAK in this instance might total up to the MAXIMUM WORTH
Listed Here Is my scenario:
1 Had MANY authorities summoned on the 17: April (5:03pm) practice from PENN to BABYLON, by employees since I declined to pay for the buck distinction that has been a continuing problem with conductors possibly being unsure of the cost construction MATH (RECEIVING VARIOUS QUANTITIES using the same KIND solution (OFF-PEAK) towards the same location AREA 7 to AREA 1 (TO and FRO),
2 "EXTENDED" to and/or "STEPUP"
Question?
COULD IT BE 6 bucks or 7 bucks from PENN to MASSAPEQUA PARK or (ZONE1-7) having a MASSAPEQUA TO JAMAICA (AREA 3-7) "OFF-PEAK"
0 comments