07/18 Signed a contract to remodel a master bath, which already had been gutted, and to remove subfloor and vinyl and replace with ceramic tile in hall bathroom.
07/18 Chris Penn (owner) brought two men and they began relocating a drain pipe, placing a marble base and installing ceramic tile in the master bath. The tear out was done before they arrived.
07/19 Two men and Chris Penn arrived and tore out subfloor in small hall bath and laid ceramic tile.
07/20 Chris Penn arrived alone to finish tile, replace hall bath door, cut bottom of and hang door to master bath. The tile on the walls and the base in the master bath needed to wait until a new base was cut because the shower doors did not fit the new base. This was discovered AFTER they installed the base and tiled around it. Wouldn't you think they would have measured the door frame to see if it fit the new base BEFORE they tiled in the base?
This meant base to be scrapped.
0 comments