We recently hired a contractor to build a patio cover and fireplace. He told us that he would obtain permitting and ensured us that everything was going to be taken care of and the structure will be to code. When we did the contract he also told us he had insurance and gave us a copy of this insurance to us. He stated that he had a warranty, which at that time, he did not produce any document, but told us that it was for labor only for two years.
During the construction time period there were many times that we inquired about the work that was doing and what we had asked for. For example, we wanted the fireplace in the corner of the patio. After the beams and framework was complete I asked him about it and he told me that with this type of patio cover that we wanted, he didn't want to do it there. He didnt want to do it there for structural purposes.