Cover on newly installed bay window was covered shabbily with black roofing shingles which does not look finished properly or waterproof. Eletrical and re-pipe work made it necessary to cut small and large holes in dry wall in several rooms. They did a really bad job of prepping and patching dry wall. Uneven in areas of patching causing it to show through after painting. Should have been built up in areas and sanded even with existing walls. Extremely sloppy painting with little to no covering of furniture, newly installed kitchen cabinets, new unstalled tile and granit countertops and sink. Paint on moulding of upper newly installed cabinets. Painters were painting right over nails sticking out of walls, not even removing them and patching. Our fireplace was demolished and rebuilt with stacked stone which is beautiful but left us with a dangerious fire hazard.
0 comments