Usacomplaints.com » Shops, Products, Services » Complaint / Review: Empire Today - Breech of contract. #291600

Complaint / Review
Empire Today
Breech of contract

Kingdom today installment 9/21/06 diane graham house elgin, illinois

Contract was authorized by salesman Mike Ryan and Diane Graham on 9/20/06 to get a wood floor to become mounted at 1029 Polly Ct. Elgin, Illinois on 9/20/06.

The household room, hall and master suite was to possess rug eliminated and wood mounted for that complete cost of $6656.00. Mike Ryan also offered an estimation of

$2300.00 for that family room and dining area surfaces to be achieved in a later day. The unique funding was no-interest no funds until 1/01/08. Diane Graham recommended salesman

Mike Ryan that there might be hardwood and rug underneath the current rug to be eliminated. He described that after dedication from the contractors, there might be an additional cost for underlayment.

On 9/21/06 the contractors came late with the incorrect cut with no underlayment. Upon further examination throughout the elimination of the previous rug, it had been decided

That underlayment was required. Denise Dering, Diane Grahamis companion was on-site for that installation and was continuously about the telephone with both John Ryan as well as

Ben Joy, the installation supervisor, at specialist Bob's demand. It had been decided that people could be billed additional for that underlayment, which we decided to. Not just

Did we accept the additional cost, but we'd to generate to Homedepot using the contractors pursuing people so that they could easily get the underlayment and also the correct cut, that was

Delivered to the house.

About The first evening of installment, all of the day and morning hours were invested with specialist Frank about the telephone with Tom Pleasure to find out what direction to go without correct

Underlayment and incorrect cut. The employees that supported Frank were eliminating outdated rug and hardwood while Joe was about the telephone. Flooring underlayment was started on 9/21/06

And timber ground examination discovered that the timber floor sent to the house was incorrect. Frank was again about the telephone with Tom Pleasure before contractors quit for that evening. We were guaranteed

The ground could be mounted in one single to 2 more times.

The 2nd time, 9/22/08, the contractors began on-floor installation following a wait having another ground sent to the house. The contractors proceeded to set up the ground about the

Second-day and requested to return a next day-to complete some small details. After having completed up the 3rd evening and shifting furniture in location, we were to phone if there

Were any issues with the ground.

Upon examination of the floor while along on-hands and legs washing the ground, we observed many places where there have been big spaces between panels as well as some panels were damaged

And cracked. We named Kingdom about these places and also the same contractors arrived on the scene with saws and floor and eliminated the places and changed them at many times for the reason that first-year. Contractors never attempted to repair the spaces within the ground, declaring which was the very best they might do. Each time we named Kingdom in regards to a difficulty using the ground, we recorded the calls and also the outcomes. Dee Brown in customer support was most useful.

Upon further examination after many efforts to correct the issues using the ground, Tom Joy, the installation supervisor, visited the house in June. He informed us that the inspector from

Shaw Floor could be out to check out the ground to find out when the ground had quality-control problems or even the problem was using the contractors. That evening in June Ben Joy reassured us he could be

The final person we'd to keep in touch with about that issue.

Tom Joy was in touch with people about having a consultant from Shaw Surfaces emerge, but that never occurred. Ben was discouraged as were we. After many calls to customer support and

Ben Pleasure, we ultimately had an inspector emerge within the drop of but he was a completely independent inspector, not from Shaw. He got many pictures having a magnifier, required examples of the ground

Which were left out from the contractors, and stated we'd be approached by Kingdom concerning the dedication. After many efforts to contact Kingdom: Dee Brown in customer support and Mary Joy, we

Were informed the inspector's statement decided that people were to obtain a substitute ground because of both installation and also the item. This, after many months of calls to Kingdom was decided at the conclusion of 2007. Nearly twelve months towards the dateof the initial ground installation.

At that time, we were named by somebody from Kingdom asking exactly how we preferred our new ground. Obviously, we'd no new ground. The conversation throughout all this hasbeen so terribly bad between

Customer support, the contractors, the revenue division, Tom Joy and his administration who never delivered our calls that people are therefore dissatisfied by what might have been an excellent knowledge.

After it had been decided that people were to obtain a new ground, Tom Joy stated we were to obtain a phone from his supervisor. He explained they'd substitute the ground and we're able to re start the funding with no issue.

We never heard from his supervisor, or did we get any details about whenever we were to obtain out ground changed. After exhausting many more weeks of no motion by Kingdomis component, we were

Also asking the funding and requesting a reduction.in the end, we'd meant to obtain the family room and dining area completed in a later day. With many of these issues due to Kingdom we

Were having severe questions concerning the ethics of the organization.

Within The weeks that adopted the guarantee from Tom Joy he will be the last person we'd need to keep in touch with about that issue became a laugh. He requested us to contact his supervisor, we got no-return calls from him.

We were subsequently approached by another guy from Kingdom, who submitted us to Troy Pringle. Mr. Pringle has had our calls and named us back on the several events, but mainly we're enjoying telephone label,

Making messages. He's informed us that people may have a brand new ground mounted and was to ensure that will occur last Drop of 2007 after initially being approached by Tom Pleasure. Mr. Pringle also mentioned the ground could be reduced and also the funding restarted along side an inspector on-site throughout the ground alternative. This discussion happened within the first week of December but still nothing has been completed. Setbacks within this issue have now been more difficult from the proven fact that we today are now being billed attention on the ground which is destroying our credit. We were guaranteed this issue could be fixed from the end-of 2007 since the% funding was to finish on 01/01/08 ansd we'd possess the new ground mounted as well as the funding restarted at that time. None of what we were assured has occurred.

We're so dissatisfied from the result within this issue and also have attempted to become individual and comprehension about Kingdom's part in obtaining this issue settled. Not oly has our persistence go out in obtaining this issue

Fixed, however now the credit we've worked so difficult to retain in excellent position has become in jepardy since we'd respected Kingdom to look after this issue once we were guaranteed. GE Card Companies has named

About the telephone with threatening communications and we've exhausted all paths to reslolve this issue with Kingdom. Guarantees weren't stored, surfaces weren't changed, and we're today in a fight not just with

Kingdom but with GE Card Providers. All we needed was a brand new ground. We've had fresh windows changed within the period because the surfaces were changed and also have compensated entirely because of the fulfillment of the merchandise and

Of the skilled contractors and customer support. We were prepared to have patience and sensible, but after 1 5 years of the issue not being solved, enough is sufficient.

We've experienced connection with the Greater Business Office, our authorized consultant, Kingdom and GE Card Providers and need this issue solved with no further period or work on our component. 1 5 years because the

Ground was requested, we still don't have any quality. We've been individual and comprehension and attempted to solve this issue. We experience Kingdom should correct this case the moment possible. Guarantees by Kingdom previously

1 5 years haven't been fullfilled and we believe we've every to be really dissatisfied using the insufficient ethics proven by Kingdom. We ought to notice from Kingdom the moment possible to correct this case.

We've been recommended by our authorized consultant to try and solve this issue with no suit. Only at that time we're operating out-of persistence and time


Offender: Empire Today

Country: USA   State: Illinois   City: Northlake
Site:

Category: Shops, Products, Services

0 comments

Information
Only registered users can leave comments.
Please Register on our website, it will take a few seconds.




Quick Registration via social networks:
Login with FacebookLogin with Google