1. Fridge shipped having a forklift hand pit within the doorway, rescheduled for shipping of another fridge a later date.
2. Cupboard top contractors incorrectly raised the number and jumped the most effective, rescheduled for brand new range shipping on a later date.
3. Dishwasher needed to be reinstalled not placed completely into units when initially mounted, a later date.
4. Countertops not cut for drain as developed for.
5. Drain initially mounted without any lure for just one aspect of the drain, rescheduled for another specialist to fix on a later date. Larry Switts has got the images.
6. Tap reinstallation planned for a later date. Sadly the individual carrying it out didn't tighten the dishwasher drain line towards the removal, he'd obtained the hose-off to achieve use of the tap, then when we did meals that night we put a water in to the units and out onto the ground. Have images if you like them.
Between Your spouse and that I we've today utilized 5 holiday times beyond the times necessary for the initial adds.
Your kitchen update with Bray and Scarf is a catastrophe. I believe compensation of the installation costs have been in order or atleast compensation for holiday times employed for modification of issues.
Bray and Scarf, Frederick Maryland.
0 comments