This guy came to my house to build a metal building.
He took 2,162 down the delivered some material and took 1,000 more. Total 3,162. He then put 6 poles in the ground
and never came back. I called and called for 5 months.
He just would say next week over and over.
I finley built it my self and another contractor.
With missing half the parts the total went from 4,000
to well over 8,000. I have seen some of the same thing
happen someone watch out for MAX FREELAND.
Richard
SAN MARCOS, California
U.S.A.