Talon Construction / Ray Lyons
They put in two tub liners, when I complaned they pulled the plug
On Dec. 27,07 a contract was drawn up between Talon construction and Mrs. Gooden. The total cost was$2990.00. Half was put down at signing, and the half at completion. On Jan. 10 a tech came out and installed two liners. On Jan. 23 I called them to complan about the tubs giving like they were't ...