Fortis Concrete
Pitched the concrete so the water pools against my foundation and floods my backyard/basement
They failed 2 pre pour and 1 post pour inspection on my job, The inspector also informed me that they did not have the 5 inches that they say, they had barely 4" which was code. They corrected the ground to get the 5" but at the day of pour they tried to underpour the concrete to only ...