Usacomplaints.com » Construction & Repair » Complaint / Review: Shirey Contracting - Fraudulent company. #412286

Complaint / Review
Shirey Contracting
Fraudulent company

We began a remodeling project with Shirey in- May.in the preliminary assembly, we are saying along with Donna Shirey and were totally in love with the organization. We were obvious with every individual we spoke to about our budget-300k. We were designated an architect and he found the home and did sketches of anything we stated we desired. Again, we repeated our budget. The builder returned to us with sketches and we shifted in to the calculating stage. The estimation returned at and we built changes centered on our budget and got the task right down to 255k. There have been many areas of the task that people could not do but we were pleased with what will be completed. Following a month or two of demolition and building-mainly mounting-the expenses are flowing in. It's rapidly becoming apparent when anything did not modify, we were likely to be vastly over-budget. When I turned increasingly stressful, the expenses extended in the future in. I required a gathering with Riley Shirey and our estimator Pauline Neault. As my spouse and that I endured within our home without any windows, no-entry gates and plastic addressing our new portion of home, we were informed that Shirey had believed the task incorrect mainly in the framework perspective. They believed the work might become nearer to 300k however they might return and appear at anything and obtain back again to people with better figures. They recommended at that time they stop-work!!! And wait until we'd the cash to carry on or choose what we desired to do. We lived in the home throughout the redesign with 3 children and 4 pets, waiting wasn't a choice. Again, we strolled around reducing tasks in the checklist to remain nearer to our figures. Shirey was all around the panel with figures... They visited 330k and at-one stage were as much as 360k. They attributed their failure to provide us accurate figures about the screw-up on Paulineis calculating as well as the foremanis speaking us into options and never providing us the figures to-go along side these choices. We were caught without any great choices. Work team is disorganized and careless-we discovered several mistakes on our bills and every factors hands at everyone. It had been a expensive headache for all of US. I did so create a notice to Donna Shirey regarding my discomfort and not seen back from her. We did obtain a fruit basket at Christmas however. That fruit charge me 350k.

The building team was a satisfaction to work well with-truthful, hardworking and communicative. The internally team must be renewed beginning with hiring individuals with building history and expertise to obtain the task costing right.

I'd not suggest Shirey or might I take advantage of them again.


Offender: Shirey Contracting

Country: USA   State: Washington   City: Issaquah
Site:

Category: Construction & Repair

0 comments

Information
Only registered users can leave comments.
Please Register on our website, it will take a few seconds.




Quick Registration via social networks:
Login with FacebookLogin with Google