Started a project Jan 4. Must move downstairs due to 85%-90% wheelchair bound. (MS-Progressive Multiple Sclerosis) To be added was a masterbedroom and converting current downstairs bedroom to a handicapped master bathroom.
As of September 11, room and bathroom are still not completed. Because our job is small, and they have from ground up homes being built in different locations, our project has been a "Oh by the way" job. We have documented on our calendar 68 days of no one on the job site what-so-ever.
Upon constance phone messages and phone conversations and some written documentations, we have reached our wits end. We just want the job completed so I can move downstairs before I am bed - ridden.
All we want is this job and rooms to be handicapped friendly and completed. As of now, I can not get out of any door in my wheelchair because of threshold hindance, if there was an emergency, such as a fire, I would be unable to get out of my own home.