Hobert Pools
Ripoff
We contracted to build a pool on 5/1/06. Hober pools said to expect 4-6 weeks build time after permitting. They said the 4th of July was doable (8 weeks after signing and 6 weeks after excavation). They claim that most of their pools are built in 4-6 weeks after permitting. Pool was permitted and ...