HAS Construction
No Material

Miscellaneous

Contracted for a remodeling job. Rod requested money upfront to purschase material. At first he wanted $7400. Settled for 5600. Never brought material. Tore house up stripped out entire bath and left bathtub full of plaster. Tore off all wood trim. Left debris in back yard in house. Took all doors off. Cabinets out and and the house was stripped. Never brought the flooring or drywall or any material. Stopped taking phone calls. Every day he had an excuse for no material or for not showing up. Then he stopped anwsering phone or email.


Company: HAS Construction
Country: USA
  <     >  

RELATED COMPLAINTS

Ridgeline Construction
Abusive contractor

Robert Manuel Construction
Charged material to my Carter Lumber Account

Elvis Jones - not even sure it's his real name
Consumer Report

Empire Today, LLC
Switched Hardwood Flooring and material put under it

BeaverHome or BeaverFloor
Ripoff

Harry Morgan With Pre-engineered Buildings Co
Used material purchased for my job on another job when material was to be held at the supply house in my company's name

Armand Jarneaux
Armand Garneaux DO NOT USE THIS SCAMMER! He took my deposit, tore out the bricks to be fixed but never finsihed the job. He showed up for a few days, only working 1 hr each day, and then must have grew tired of d

J&L Maintenance and Construction
Money upfront for no show. Stay away!

Valley Home Improvement
Edward Hornsby DBA Valley Home Improvments Thief, Liar, unprofessionial, unqualified, did not finish work, charged items to me not used, threaten harm

JGF Construction
John Forzetting Bad Work-Bad Attitude-Doesn't honor written policy