Pg&E
Overcharged for power use, not a smart meter. Pge refuses to eval the monitored power use measures
- 07-02-2010
- 8
PG&E has refused to review all the evidence in our case claiming overcharging for power use. We monitored actual use at circuit site and at meter. They closed case before granting us medical baseline for our medical equipment, have refused to accurately review evidence since May, claiming they have all they need.
Utility is trying to charge us $500/mo. For small 1800 sq ft. Apt. Using
Company: Pg&E
Country: USA
State: California
City: San Francisco
Address: PO Box 700000, San Francisco, CA
Site: pge.com