Hausz Concrete
Contract work avoided
- 09-13-2010
- 56
A concrete driveway was poured guarantee not to crack. The frist month a cracked develop.in May he informed me that it would get fixed in May or June. This has not been done. Last time I spoke with him in July it sounded like he was not going to do the repairs. A letter was sent asking to have it done by end of August. No reply from him. We just want driveway fixed as agreeded. Thanks
Company: Hausz Concrete
Country: USA