After much research and their reputation we decided to go with Pioneer Pole Buildings to build our Garage in the summer of 2011 BIG MISTAKE WHAT A MESS!!! Everything was supposed to be included in the loan. We stated excavation on 7/25 we had to pay half up front and the other half the day of completion, no problem 1 out of pocket expense, we did just that. The guys pulled in on 7/28 to start the building everything went well until day 2 when they apparently were short a guy and needed to set trusses, we helped them set the trusses (and we have pictures to prove it). We were charged for a permit service, in the loan why I am not sure because in this area we did not need a permit. The building over all went up without a hitch aside from us having to help them set the trusses, the outside expenses, havign the redo the loan paper work... Sure with out a hitch right? What else could go wrong???

Now time for the doors, and garage floor. F&L Doors wonderful, very polite, quick and considerate were here the next day to install the doors. The Garage floor is another story. Charlie Killian (part owner of Ark Enterprises/Rentals w / Robert (Bob) Greene) called, after we emailed pioneer to find out when the floor was being poured, He stated the ground had to settle about 10 days before he poured, we understood that. He advised us we would need a tri-axle load of 2B stone, he came down to look at the site, we had 23 ton of stone just delivered he advised us that would not be enough (this was a 30x30 building) and we would have to get another load. Again another expense out of pocket here, he also advised when we asked about the apron, he stated that was not included in the pour, so again another out of pocket expense. He also stated we had to move all the stone into the site and tamper it, he would do it for us but he would have to charge us for it, another out of pocket expense. We moved all the stone into the building by wheelbarrow.

The guys arrived the morning of August 25th to start working, Charlie called about 20 miins after 7AM the guys were here about 10 mins by this time, he told them the weather was unpredictable and they needed to pull out. We understand you cannot control Mother Nature, however, it was already done raining (we had a little shower) and the sun was shining as the guys were cleaning up, one guy said well I see Charlie jumped the gun again. Apparently the concrete company wanted Charlie to take the concrete right away because they had some cancellations in the area (keep in mind they trucked this concrete 2.5 hours away to our home) when we have a concrete company with in 20 mins from our home. They came back the following week to pour, only after getting on the phone with Charlie and being insistent to come back out sooner than the week after labor day.

The guys came back out the next week poured the floor. We were not happy with the pour, the color was all uneven, it looked burnt in other areas, there was no concrete where the garage frames meet the floor, there was no concrete in the corners you could see daylight out the corner of the building, one spot in the one bay was an inch higher than the rest of the floor. The place the forced the expansion joints cracked (that is expected, that is what they are supposed to do). However, it was crumbling in the corners where the expansion joints met. We called Charlie, he came down to look at it, he sent Kevin down to fill in the spots they missed and grind down and patch the floor where it was much higher. He also said I sprayed a sealer on it that should help please you the sealer was like walking on glass with wet shoes, and now 6 months after the sealer been on, you cannot even see it anymore, and NO it didnt please me.

Charlie said call me in April if there is still an issue and I will come out and take a look at it again. I called Charlie because the cracking is horrible, the floor is an inch lower in the center of each bay then around the ends. Charlie came down with Kevin, and said the floor was solid and he would do nothing to fix it except buy a product to fill in the cracks, I asked who was going to put that product in? His response, well, not me or my guys. I expressed how we didnt even have a bad winter with a good freeze, and Charlie said that didnt matter, although back in September he said we had to let it sit through a winter so we could see the extent of the cracking and crumbling, with the expansion and contraction. Charlie said well youre are putting pressure on it. Yeah we are it is a garage silly concept to think you can park a vehicle in it huh?

Bottom line I have a Garage floor that looks 20 years old in a building that is less than a year old. I have contacted Pioneer Pole Buildings because Robert Greene, owns pioneer and also part owner of Ark Rentals/Enterprise, who also sent Charlie down to do the floor. I asked for their quality guy, or inspector to come down and take a look at this and all my contacts to the company went unanswered. When I contacted them about the dissatisfaction last year I never heard from Mr. Greene but I did hear back from some of the people I worked with in the company stating, that since Ark was their sister company they would take care of this since it is their reputation on the line as well, I have emailed Mr. Greene my emails were forwarded to him from people in his company but I never once heard from him. I have pictures from before the pour and after the pour I have pictures and I welcome anyone to come see this horrible job. Funny how neither Pioneer nor Ark seems to care about their reputation once the job is done. Charlie walked out a few weeks ago when he was here and said so sue me nice response coming from a contractor huh?

Also if you check out Ark Enterprises in the PA State Attorney General Website their registration expired on, no wonder they have no reason to stand behind their work, they dont care.

All I want is my Garage floor fixed and not with a patch in and Garage that is less than a year old.


Company: Pioneer Pole Buildings / Ark Enterprises
Country: USA
State: Pennsylvania
City: Schuylkill Haven
Address: 716 South Route 183
Phone: 5707390078
Site: pioneerpolebuildings.com
  <     >  

RELATED COMPLAINTS

American Garage Builders
Rip off! Charged to remove concrete and covered it up. Miss measured and had to cut concrete and patch

Brooks Ruhman Owner, Concrete Floor Designs
Want stand behind his concrete stain job done on my new sunroom floo

Kolde Concrete Construction
I hired Kolde Concrete

Cheap Charlie's Tree Service
“Don’t Call Cheap Charlie's Tree Service”

Rose Concrete
Rose Concrete Additives, Ron Ash, RCAC Totally screwed up new driveway, then walked away from job unfinished

Durabond Seamless Flooring
Robert Kirchner Ripoff Did not respond to complaints

Unique Automotive Repair / Charlie Reeves
Unique Automotive Repair - Charlie Reeves What a scam! Charlie Reeves and his accomplice girlfriend, Stacia Smith, will rip anyone off. They lie, steal and cheat to stay in business. Then when the heat gets on they move to another building, t

Charlie Biggins Construction
Charlie Biggins Construction Memphis stole our $1,200 House Plans

C & N Professional Landscaping
Mr. Cu - Cu Phan Mr. Cu does poor quality concrete jo

Charlie's Wholesale Tires
Charlie's Wholesale consumer ripoff Tires Broke off a bolt on BOTH front tires