VIP Homes - VIP Construction
Ripoff signs deal to sell or build house with agreed to stipulations, then changes deal and raises price, and force buyer to accept un-needed appliances
- 11-01-2004
- 2
On 9-29-04 a was authorized to buy aspec house which was in mounting phases which was due for conclusion from the end-of December.
The price was significantly filled by $20,000 in under 30 days from whenever we first looked over this design, till the full time we created our choice.
We're also billed a $5,000 charge since we choose to not utilize their favored lender, nevertheless this charge was included on after our paperwork was authorized and we were requested "have you got a lender".
On 9-30-04 our bank supplied the $3000.00 serious income per the arrangements.
On 10-19-04 a big change order was created and authorized by VIP and also the customers for Hardwood Updates, Corian Surfaces, Rug Adjustments, Credit for utilizing our very own furnished devices of $816.50, permit us to make use of our very own fresh provided drain and tap, and altering the scenery bundle from T To Some. Although we there we'd the drain around, as well as their repetition calculated the drain and established that it'd match without problems. We also select shades of the counter that highlighted the colour of the drain, in order of the day anything is just a move.
On 11-01-04, we obtain phone in the repetition, declaring there's an issue with this devices and drain. It had been mentioned that people possess some main problems using the devices supplied, and we questioned what issues, they responded the plumber will not place our equipped drain and tap in and also the Vicepresident of VIP nixed the offer which we'd need to make use of the "standard bundle" and shed our credit of $816.50.
This provides many problems, we are in possession of devices our completely ineffective to us, along with a drain that doesn't complement the decoration that people selected round the cooking area.
We experimented with work-this out together about the telephone, nonetheless they was no reducing, and VIP houses "received the point".
We believe the plumber "cryed" towards the VIP administration about needing to cope with "additional" devices, and VIP administration caved.
We also questioned about performing a number of our very own "easy low-voltage" home theatre wiring just before drywall, simply because they don't provide a wiring bundle with this house, we were informed that people might obtain a callback if there could be any difficulties with this function. We never received a call-back.
this type of exercise makes us speculate so just how additional issues as time goes on are likely to managed, so when they to obtain back around, "its their way or even the hi-method"
The leader of VIP could be approached at his house situated in Gilbert, feel liberated to provide him a trip:
Victor gary petersen
president/ceo
126 s mariner courtroom
gilbert, az 85233
We're nevertheless prepared to provide this challenge to some friendly near, nevertheless that's all-up to VIP Houses.
Company: VIP Homes - VIP Construction
Country: USA
State: Arizona
City: Mesa
Address: 3048 E. Baseline Suite 102
Phone: 4808921654